Though most of the visible work was finished in September, preparation for the foundation project continued through the fall.
After the water system was drained in October, Sue disconnected and removed the plumbing running through the living room area.
In addition to the rewiring during porch demolition, Dave moved a lot of electrical wiring under the camp before the foundation work began.
This guy really knows how to set up right to do a job ... and look at the precision of that wiring!